This volume covers the use of spread mooring systems in the context of barges. It deals with both static (drilling unit/support ship) and mobile (pipelaying/trenching) mooring spreads. The book will assist barge Masters, barge movers, tower foremen, barge engineers, marine advisors, warranty surveyors and others to use ‘in the field’ to assist them in their work. Previously published by Clarkson Research Services Ltd.
This book concentrates on the mooring systems of semi-submersibles, but the procedures and equipment used can apply to other types of specialist vessels. It includes practical guidance on topics such as anchor types. The text is supported by detailed diagrams of concepts such as deployment theory, as well as graphical presentation of anchor holding capacity. Other topics detailed include mooring equipment, the problems associated with anchoring equipment and advice on operational safety.
Part
                                        1
                                        Anchor
                                        Theory
                                        and
                                        Practice
1.1
                                        Catenary
                                        mooring
                                        system
                                        theory
1.2
                                        Design
                                        of
                                        spread
                                        mooring
                                        systems
1.3
                                        Oil
                                        industry
                                        anchors
1.4
                                        Anchor
                                        types
                                        and
                                        behaviour
1.5
                                        Method
                                        of
                                        operation
                                        HHP
                                        anchors
1.6
                                        Predicting
                                        holding
                                        power
1.7
                                        Frictional
                                        resistance
                                        of
                                        the
                                        anchor
                                        line
1.8
                                        Soil
                                        description
                                        and
                                        drag
                                        anchor
                                        factors
1.9
                                        Soil
                                        classification
                                        table
1.10
                                        Improving
                                        anchor
                                        performance
1.11
                                        Anchor
                                        cable
                                        catenary
                                        data
                                        and
                                        its
                                        uses
1.12
                                        Running
                                        HHP
                                        anchors
                                        in
                                        very
                                        hard
                                        ground
1.13
                                        Mooring
                                        calculations
1.14
                                        Working
                                        tension/initial
                                        pretension
                                        and
                                        storm
                                        loads
1.15
                                        Anchor
                                        running
                                        tables
                                        (chain
                                        moorings)
1.16
                                        Minimum
                                        deployed
                                        length
                                        –
                                        test
                                        and
                                        working
                                        tensions
Part
                                        2
                                        Mooring
                                        Equipment
2.1
                                        Anchors
2.2
                                        Anchor
                                        line
                                        –
                                        wire
                                        and
                                        chain
2.3
                                        Anchor
                                        rigging
2.4
                                        Anchor
                                        chasers
2.5
                                        Drop
                                        anchor
                                        rigging
2.6
                                        Permanent
                                        chain
                                        chaser
                                        pennants
2.7
                                        Anchor
                                        shackles
                                        tables
                                        and
                                        dimensions
2.8
                                        Bulldog
                                        grip
                                        table
2.9
                                        Attachment
                                        of
                                        anchor
                                        to
                                        anchor
                                        line
2.10
                                        Pennant
                                        connection
                                        pigtails
2.11
                                        Pennant
                                        lines
2.12
                                        Pennants
                                        –
                                        use
                                        of
                                        pigtails
                                        and
                                        rigging
2.13
                                        Open
                                        and
                                        closed
                                        spelter
                                        sockets
2.14
                                        Pennant
                                        wire
                                        –
                                        standard
                                        lengths
                                        and
                                        coding
2.15
                                        Anchor
                                        buoys
2.16
                                        Clump
                                        weights
Part
                                        3
                                        Anchor
                                        Patterns
3.1
                                        Anchor
                                        patterns
Part
                                        4
                                        Planning
                                        Mooring
                                        Operations
4.1
                                        Basic
                                        planning
                                        steps
4.2
                                        Planning
                                        questions
                                        to
                                        be
                                        answered
4.3
                                        Mooring
                                        plan
4.4
                                        Anchor
                                        handling
                                        vessels
4.5
                                        Positioning
                                        systems
4.6
                                        Rig
                                        move
                                        procedure
4.7
                                        Site
                                        surveys
4.8
                                        Approvals
                                        and
                                        permissions
4.9
                                        Positioning
                                        systems
                                        –
                                        requirements
                                        and
                                        capabilities
4.10
                                        Anchor
                                        handling
                                        vessel
                                        requirements
                                        -
                                        what
                                        type
                                        and
                                        how
                                        much
                                        power
                                        is
                                        needed?
4.11
                                        Briefing
                                        and
                                        discussion
                                        with
                                        workboats
4.12
                                        Basic
                                        rules
                                        of
                                        anchor
                                        work
4.13
                                        Operational
                                        cautions
                                        –
                                        notes
                                        on
                                        good
                                        practice
4.14
                                        Going
                                        onto
                                        location
4.15
                                        Departure
                                        from
                                        location
4.16
                                        Crew
                                        deployment
                                        and
                                        briefing
4.17
                                        Anchor
                                        handling
                                        orders/advice
                                        and
                                        vocabulary
4.18
                                        Positioning
                                        system
                                        checks
                                        –
                                        going
                                        onto
                                        location
4.19
                                        Re-running,
                                        test
                                        tensioning
                                        and
                                        final
                                        positioning
4.20
                                        Verifying
                                        mooring
                                        line
                                        position
                                        in
                                        tight
                                        locations
4.21
                                        Equipment
                                        checks
                                        for
                                        anchoring
                                        machinery
4.22
                                        The
                                        anchor
                                        handling
                                        basket
4.23
                                        Check
                                        list
                                        for
                                        anchor
                                        handling
4.24
                                        Anchor
                                        handling
                                        plan
                                        and
                                        procedure
4.25
                                        Marine
                                        procedures
Part
                                        5
                                        Running
                                        and
                                        Retrieving
                                        Anchors
5.1
                                        Running
                                        anchors
                                        –
                                        summary
                                        of
                                        operations
5.2
                                        Running
                                        anchors
                                        –
                                        sequence
                                        of
                                        events
5.3
                                        Retrieving
                                        anchors
                                        –
                                        permanent
                                        chain
                                        chaser
                                        systems
5.4
                                        Retrieving
                                        anchors
                                        –
                                        buoyed
                                        systems
5.5
                                        Passing
                                        pennant
                                        wires
5.6
                                        Breaking
                                        chain
                                        out
                                        of
                                        sticky
                                        ground
5.7
                                        Racking
                                        anchors
Part
                                        6
                                        Specialised
                                        Anchor
                                        Work
6.1
                                        Introduction
                                        to
                                        specialist
                                        mooring
                                        operations
6.2
                                        Two
                                        boat
                                        operations
                                        –
                                        laying
                                        and
                                        retrieving
                                        anchors
6.3
                                        Mooring
                                        on
                                        smooth
                                        rock
                                        bottoms
6.4
                                        Confined
                                        space
                                        short
                                        mooring
                                        –
                                        doubled
                                        chain
6.5
                                        Interference
                                        mooring
6.6
                                        Anchoring
                                        sequence
6.7
                                        Anchoring
                                        sequence
                                        –
                                        running
                                        anchor
                                        through
                                        flare
                                        bridge
6.8
                                        Support
                                        mooring
                                        operation
6.9
                                        Support
                                        mooring
6.10
                                        Jack-up
                                        positioning/mooring
                                        operations
                                        with
                                        interference/cross
                                        line
                                        problems
6.11
                                        Mooring
                                        over
                                        obstructions
                                        without
                                        support
                                        buoys
6.12
                                        Installation
                                        of
                                        single
                                        buoy
                                        moorings
                                        (SBMs)
6.13
                                        Special
                                        moorings
Part
                                        7
                                        Mooring
                                        Problems
                                        –
                                        piggy
                                        backing,
                                        fishing
                                        and
                                        fouling
7.1
                                        Piggy
                                        back
                                        anchor
                                        work
7.2
                                        Fishing
                                        and
                                        grappling
7.3
                                        Problems
                                        with
                                        anchoring
                                        equipment
7.4
                                        Gypseywear
7.5
                                        Windlass
                                        drive
                                        teeth
                                        damage
                                        and
                                        wear
7.6
                                        Spurling
                                        pipe
                                        wear
Part
                                        8
                                        Pipelaying
                                        Barge
                                        Mooring
                                        Work
8.1
                                        Plotting
                                        anchor
                                        movements
8.2
                                        Pipeline
                                        crossing
                                        operations
8.3
                                        Temporary
                                        buoys
8.4
                                        Temporary
                                        pipeline
                                        crossing
                                        arrangements
8.5
                                        Beach
                                        pull
                                        operations
8.6 Cautionary note – limits of weather working
Part 9 Heavy Lift Barge Operations
Part
                                        10
                                        Operational
                                        Safety
10.1
                                        Risks
                                        on
                                        the
                                        anchor
                                        handling
                                        boat
10.2
                                        Risks
                                        on
                                        the
                                        barge
Part 11 Positioning Systems
Part 12 Boat Selection and Capability
Part
                                        13
                                        Mooring
                                        System
                                        Management
13.1
                                        Introduction
13.2
                                        Daily
                                        routine
13.3
                                        Moving
                                        the
                                        vessel
                                        within
                                        the
                                        anchor
                                        spread
Part
                                        14
                                        Anchor
                                        Winch
                                        Operation
14.1
                                        General
                                        remarks
14.2
                                        Basic
                                        operational
                                        precautions
14.3
                                        Specialised
                                        barge
                                        winches
14.4
                                        Emergency
                                        release
14.5
                                        Electrically
                                        driven
                                        winches
                                        –
                                        features
14.6
                                        Notes
                                        on
                                        mooring
                                        line
                                        length
                                        and
                                        tension
                                        devices
14.7
                                        Operators’
                                        instructions
14.8
                                        Trouble
                                        shooting
14.9
                                        Weekly
                                        anchor
                                        winch
                                        tests
Part
                                        15
                                        Anchor
                                        Line
                                        Inspection
15.1
                                        Chain
                                        mooring
                                        line
                                        damage
                                        types
                                        –
                                        symptoms,
                                        causes
                                        and
                                        remedies
15.2
                                        Visual
                                        examination
                                        of
                                        chain
                                        cable
15.3
                                        Detailed
                                        specialist
                                        examination
15.4
                                        The
                                        use
                                        of
                                        replacement
                                        anchor
                                        chain
                                        studs
                                        (gem
                                        stud
                                        type)
15.5
                                        Mechanical
                                        properties
                                        of
                                        chain
                                        grade
                                        steel
15.6
                                        Procedure
                                        for
                                        chain
                                        inspection
                                        –
                                        notes
15.7
                                        Wire
                                        mooring
                                        line
                                        inspection
                                        and
                                        maintenance
                                        guidelines
Part 16 Anchor Handling Reports
Part 17 Adverse Weather and Working Limits Data
Michael
                                        Hancox
Captain
                                        Michael
                                        Hancox
                                        is
                                        a
                                        Marine
                                        Consultant
                                        and
                                        former
                                        Director
                                        of
                                        Hancox
                                        Marine
                                        Services
                                        Limited.
Witherbys
Witherbys
                                        titles
                                        are
                                        developed
                                        using
                                        scripts
                                        developed
                                        by
                                        technical
                                        experts
                                        that
                                        are
                                        peer
                                        reviewed
                                        within
                                        work
                                        groups.
                                        Typically,
                                        they
                                        seek
                                        to
                                        improve
                                        understanding
                                        of
                                        the
                                        regulations,
                                        recommendations
                                        and
                                        guidelines
                                        issued
                                        by
                                        Industry.
                                        
Witherbys staff have significant expertise in the fields of navigation and hazardous cargoes as well as in the presentation of complex subjects in a graphic and easy to understand manner.
- Number of Pages:
 - 500
 - ISBN:
 - 9781870945752
 - Published Date:
 - November 2005
 - Binding Format:
 - Paperback
 - Book Height:
 - 295 mm
 - Book Width:
 - 205 mm
 - Weight:
 - 2.1 kg
 - Author:
 Michael Hancox and Witherbys
- Preview:
 - Yes